Port to REZ Project – Port of Newcastle to Elong Elong
About the project
The Port to REZ project is designed to ensure the efficient and timely transport of oversize over-mass (OSOM) vehicles, carrying essential components to construct and operate major critical REZ transmission and generation projects including wind turbine parts, high-voltage transformers, and synchronous condensers. These upgrades support the construction of transmission and generation projects within the Central West Orana Renewable Energy Zone, strengthening the region’s renewable energy infrastructure.
The project consists of upgrades and modifications at 19 locations spanning more than 300 kilometres from the Port of Newcastle, along the New England, Golden, and Castlereagh Highways.
To view the upgrades at the 19 locations, visit the Port to REZ interactive map.