About the project

BMD Constructions was contracted to commission two new clarifiers at the Douglas Water Treatment Plant (WTP) to increase the plant resilience and provide additional water security for the growing Townsville population.

As part of Townsville’s Drinking Water Scheme, the new infrastructure provides the ability to treat 950 litres of raw water per second through the module 3 clarifier and 1100 litres per second through the module 4 clarifier.

Scope

Supply and installation of module 3 and 4 clarifiers into the existing Douglas WTP

Relocation of existing underground services including temporary works shutdowns and isolation

Supply and installation of underground pipework and electrical services

Supply and installation of aboveground pipework

Earthworks and stormwater drainage

Concrete works

Design, supply, and installation of electrical equipment

Supply and installation of mechanical equipment

Supply and installation of structural steel, walkways, and platform

Supply and installation of chemical dosing systems commissioning

RixRyan-20230403-RRP_3601-scaled.jpg
rixryan-20230403-rrp_3709
RixRyan-20230403-DJI_0302-scaled.jpg

Outcomes

Managed international logistical delivery delays throughout the COVID-19 pandemic which impacted 32 containers of the proprietary lamella equipment. Through rescheduling the construction program of the clarifiers, BMD Constructions was able to initially deliver and commission a single clarifier. This allowed plant operators, Trility, to continue water treatment operations without further delaying water delivery to the Townsville community

Partnered with Aquatec Maxcon to redesign the filtration lamella systems, providing superior clarifiers for the effective removal of turbidity, leading to substantial improvement to the filter run time

Implemented a local first approach, employing Townsville contractors and suppliers to deliver the project