New Mount Crosby Vehicle Bridge opens to traffic
The Mount Crosby Vehicle Bridge has opened to traffic, with the new bridge delivering greater flood resilience and connectivity for the Mount Crosby and local communities.
BMD Constructions was awarded the project by Seqwater after the existing single lane weir bridge received substantial damage during an extreme weather event in 2022.
Approximately three metres higher than the existing weir bridge, and with a combination steel and concrete guardrail to better withstand flooding, the new bridge provides a more flood-resilient route and delivers improved traffic flow over the Brisbane River in Mount Crosby.
BMD Constructions General Manager of Queensland and the Northern Territory, Rob Pickard, said the high-quality asset delivered is a result of collaborative contracting and innovative engineering.
“BMD is proud to have worked closely and collaboratively with Seqwater to deliver the new Mount Crosby Vehicle Bridge that will see improved flood resilience and connections for road users, and the local communities."
“Our strong 45-year history and connections in South East Queensland have enabled us to leverage local suppliers and support local jobs, to efficiently and safely deliver this important piece of infrastructure,” Mr Pickard said.
The project formed part of the East Bank Flood Resilience Program, a program of work to bolster flood resilience in Mount Crosby.
Related news
5 Feb 2025
BMD Constructions extends work on Tonkin Highway with new Alliance win
4 Dec 2024
BMD begins construction on Stage 2 of Riverway Drive
26 Nov 2024
BMD joins SA Water’s landmark $3.3 billion capital program
20 Nov 2024
New Brooking Channel Bridge opens ahead of wet season
2 Oct 2024
Innovation in action at the Western Treatment Plant
28 Aug 2024
BMD builds on long-term relationship with Melbourne Airport through delivery of Retarding Basin upgrade
2 Aug 2024
BMD awarded $87 million contract to pave the way for 2032 Games Athlete Village
1 Aug 2024