Tarong Energy Ash Disposal to Mine Void

Location
Tarong, Queensland
Value
$28 million
Client
Tarong Energy Corporation Ltd
Status
Complete
11sep09ar0009

About the project

Located 180 kilometres north-west of Brisbane, the Tarong Power Station can supply electricity to the equivalent of eight cities the size of Toowoomba.

Scope

BMD was engaged on one of Queensland’s largest power stations to design, procure, construct, and commission the mine’s technically advanced ash disposal system.The system collects, liquefies, pumps, transfers, and places ashy slurry from the two power stations to a disposal site 5 kilometres away.The ash contraption involved the installation 2 kilometres of 150 millimetres in diameter, extra strong, carbon steel pipe, a megalitre steel tank, support structure and agitator to convert the ash to slurry (55% concentration).

Outcomes

BMD successfully managed the entire turnkey process including mechanical, civil, structural, electrical, and control features. BMD’s key initiatives for success included prompt design development, identifying and expediating procurement of long lead time items, and focusing on commissioning and operations early. Ultimately, ash placement in the mine void met the strict geological and environmental mine requirements.