About the project

The Kauri Parade Community and Sporting Precinct is one of the City of Holdfast Bay’s three main hubs for sport and recreation. Approximately 3 hectares in size, the precinct provides both open space and structured sporting facilities and is home to several sporting, recreation and community groups, including Seacliff Hockey Club, Seacliff Tennis Club, Seacliff Sport Club and Holdfast Bay Music Centre.

BMD was engaged through an early contractor involvement model to design and construct the public infrastructure project, which allowed our project team to optimise the design in all aspects including constructability.

Scope

Clearing and demolition works

Earthworks involving cut and fill

Relocation of land fill waste

Construction and installation of 10 tennis courts and two interchangeable sport courts

Construction of 8000m2, 150 millimetre thick suspended concrete slab

Installation of 540 steel, concrete filled driven piles

Installation of gabion retaining wall

Installation of all stormwater, water and electrical services

Installation of 12 light poles and switchboard

Installation court ancillary items including fencing, netting, asphalt, plexipave, line marking, shade shelters, and drinking fountains

_rrp3740
_rrp3718
_rrp3745

Outcomes


During construction, the team placed a heavy focus on the environmental aspects of the project, as the construction site was located on top of a redundant landfill site. The complex earthworks on contaminated land were performed with no noise, dust, or water contaminants leaving the site or affecting workers or the public.

Civil Contractors Federation

Earth Awards

Winner Category 2: Project value $1 million to $5 million